For a period of 1 410 days, 6 times, beginning on January 12, 2021, city21.pk was tested for availability. City21.pk returned a 200 status code 3 times out of analyses that was conducted, with the last one occurring on November 17, 2024. 50.00% of the inspections, or 3 incidents, revealed that city21.pk was unavailable, with the most recent instance occurring on June 3, 2024. Based on the responses received, there are no instances of error status codes recorded as of November 22, 2024. Differing from an average of 0.228 seconds, city21.pk responded in 0.001 seconds on November 17, 2024.